Page 2 of 2 FirstFirst 12
Results 11 to 14 of 14

Thread: testing VVS cmpn project delayed again, is chuck olders fault..... | Forums

  1. #11
    Senior Member bird_brain's Avatar
    Join Date
    Feb 2004
    Posts
    2,637
    <BLOCKQUOTE class="ip-ubbcode-quote"><div class="ip-ubbcode-quote-title">quote:</div><div class="ip-ubbcode-quote-content">Originally posted by Enforcer572005:
    I absolutely refuse to pay extortion money to the same outfits that refueled U-boats off the coast and are taking advantage of this lousy hurricane here in the southern US. </div></BLOCKQUOTE>
    Enforcer... I think you are having High School flashbacks. You need to stop pedaling before you have to see the Doc.
    I tanked up yesterday and laughed at everyone in line @ the BP waiting a 1/2 hour to pay $3.20 for their gas. I hope the last laugh isn't on me.
    Reply With Quote Reply With Quote

  2. #12
    Hey BB, I saw on the news that in atlanta the gougers are charging nearly 6 bucks, then I saw the govenor say that cr#p was gonna stop. my mother refueled here van for about 2.60, then went to top off my PU tk and the same place was 2.93 20 min later. This is getting absurd. I hope the gov lives up to his word.

    I think its time to drag out the germans synthetic fuel technology they used in the war, or make small nuke reactors like Lee Majors had in the $6m man. I cant handle this peddling nonsense much longer....I dont believe how hairy it is to pedal these things amongst the mindless. I pedaled across a rather large bridge (on Turner McCall Blvd if you ever get back to rome) and that thing was a nightmare...i found myself looking about 70 ft straight dn at a river on one side with guard rails that didnt reach my knees, and having about a foot of clearance from traffic on the ohter....about 1.5 meter channel of "safety" I could travel through, and it was alot more of an incline than it looked. I wound up riding the brakes most of the way hauling A at an alarming velocity. I felt like I was threading my way through the Arc de Triumph like Eddie Rickenbacker did in that Spad. I DONT like it.This reminds me of "Death Race 2000". In high school I drove my Dads old corvair and my 73 Grand Prix-thought I was done with 2 wheels. this is worse than 73 during the Yom Kippur war.

    ------------------------------

    Sleep tight tonight, your Air
    Force is......awake!
    Reply With Quote Reply With Quote

  3. #13
    Senior Member bird_brain's Avatar
    Join Date
    Feb 2004
    Posts
    2,637
    <BLOCKQUOTE class="ip-ubbcode-quote"><div class="ip-ubbcode-quote-title">quote:</div><div class="ip-ubbcode-quote-content">Originally posted by Enforcer572005:
    ...i found myself looking about 70 ft straight dn at a river on one side with guard rails that didnt reach my knees, and having about a foot of clearance from traffic on the ohter....about 1.5 meter channel of "safety" I could travel through, and it was alot more of an incline than it looked. I wound up riding the brakes most of the way hauling A at an alarming velocity. I felt like I was threading my way through the Arc de Triumph like Eddie Rickenbacker did in that Spad. </div></BLOCKQUOTE>
    Sounds like fun... maybe I should take my bike down from the garage roof and pump up the tires.
    Only problem is 20 miles to work and dropping the kids @ school.
    Reply With Quote Reply With Quote

  4. #14

    Let the kids ride their own bikes....it'll build "character".


    Like Dan Akroid said as daddy conehead....."when I was your age, I walked 20 dextrons through frozen pharthite crystals to reach my learning center".

    ------------------------------

    Sleep tight tonight, your Air
    Force is......awake!
    Reply With Quote Reply With Quote

Page 2 of 2 FirstFirst 12

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •